Skip to main content

Table 2 Activities comprising the standard work cycle for a harvester operation

From: The accuracy of measurements in a time study of harvester operations

Work time categories

Activity codea

Activity description

M W—main work time

1

Positioning

2

Cutting

3

Felling/pulling a tree onto a machine

4

Delimbing and bucking

C W—complementary work time

5

Travel within a worksite

  1. aNumeric codes introduced above are used in time series analyses (Figs. 3, 4, 5 and 6)