Skip to main content

Table 6 Regression model for scanning value recovery ($ m −3 )

From: Time of day impacts on machine productivity and value recovery in an off-forest central processing yard

Variable1

Coefficient

Standard error

t-statistic

p-value

Intercept

7.96

2.72

2.9

0.0035

Stem Size

57.76

1.94

29.8

<0.00001

Stem Size Squared

−6.56

0.38

−17.2

<0.00001

Group E Operators

6.64

0.89

7.5

<0.00001

SBandE2

3.77

1.09

3.4

0.00059

Time of Day3

−0.36

0.08

−4.5

<0.00001

Total degrees of freedom

 

F statistic

 

Adjusted R Square

2807

 

506.2

 

0.474

  1. 1Stem size is the average stem size (m3) scanned during each hour. Group E was an indicator variable for three operators whose value recovery was different from the other two scanner operators.
  2. 2SBandE was an indicator variable for those hours in which a scheduled break occurred or in which end-of-shift work was undertaken.
  3. 3Time of day is based on a 24 hour clock; e.g. 4 = from 4.00 to 4.59 am, 16 = from 4.00 to 4.59 pm, etc.