Skip to main content

Table 4 Regression model for scanning volume productivity (m 3 h −1 )

From: Time of day impacts on machine productivity and value recovery in an off-forest central processing yard

Variable1

Coefficient

Standard error

t-statistic

p-value

Intercept

52.4

5.4

9.7

<0.00001

Stem size

28.9

1.7

16.8

<0.00001

Group A operators

−10.3

2.4

−4.4

0.00001

Group B operators

−17.2

2.4

−7.0

<0.00001

SBandE2

−33.4

2.4

−14.1

<0.00001

Time of day3

−1.0

0.2

−5.7

<0.00001

Total degrees of freedom

 

F statistic

 

Adjusted R Square

1890

 

129.1

 

0.254

  1. 1Stem size is the average stem size (m3) scanned during each hour. Group A and Group B operators were indicator variables for single operators whose productivity was different from members within other groups, but not with members in the same group. Note that the default operator value was when two or more people scanned stems within the same hour.
  2. 2SBandE was an indicator variable for those hours in which a scheduled break occurred or in which end-of-shift work was undertaken.
  3. 3Time of day is based on a 24-hour clock; e.g. 4 = from 4.00 to 4.59 am, 16 = from 4.00 to 4.59 pm, etc.