From: Effect of work schedule design on productivity of mechanised harvesting operations in Chile
Category | Sub-category | Hours worked per day | Average ** productivity (m3 hr-1) | Standard error productivity (m3 hr-1) | Change in productivity relative to 9-hour work day (%) |
---|---|---|---|---|---|
Season | Winter | 9 | 58 a | 0.2 | 0 |
 |  | 12 | 53 b | 0.3 | −9 |
 |  | 16 | 47 c | 0.4 | −19 |
 |  | 18 | 41 d | 0.7 | −29 |
 | Summer | 9 | 57 a | 0.3 | 0 |
 |  | 12 | 50 b | 0.4 | −12 |
 |  | 16 | 41 c | 0.6 | −28 |
 |  | 18 | 37 d | 1.2 | −34 |
Forest Class* | A | 9 | 72 a | 0.2 | 0 |
 |  | 12 | 65 b | 0.3 | −12 |
 |  | 16 | 59 c | 0.5 | −23 |
 |  | 18 | 56 d | 1.2 | −28 |
 | B | 9 | 55 a | 0.2 | 0 |
 |  | 12 | 51 b | 0.4 | −7 |
 |  | 16 | 47 c | 0.5 | −13 |
 |  | 18 | 45 d | 0.9 | −18 |
 | C | 9 | 41 a | 0.2 | 0 |
 |  | 12 | 40 a | 0.3 | −1 |
 |  | 16 | 37 b | 0.4 | −7 |
 |  | 18 | 34 c | 0.5 | −12 |
 | D | 9 | 29 a | 0.2 | 0 |
 |  | 12 | 28 a | 0.3 | −1 |
 |  | 16 | 27 b | 0.3 | −3 |
 |  | 18 | 25 c | 0.6 | −7 |